A licensed general contractor who shows up when they say, keeps the budget in writing, and texts you a daily update with photos. Miss our call? You'll get a text back in 60 seconds.
Everyone has a story about the contractor who vanished. When we're on a job and can't pick up, our system texts you right away. Reply with what you're planning and we'll set up a design visit.
Design, permits, build, and cleanup under one roof. You get a fixed price and a calendar before we start, and a text with photos every evening.
Layouts, cabinets, counters, lighting, and the wall you want gone — one crew, one contract, one timeline.
Tile showers, walk-in tubs, double vanities, and full gut remodels done in 2–3 weeks, not months.
Finished basements with egress, bathrooms, and real ceilings. Waterproofing checked before a single stud goes in.
Bedrooms, sunrooms, second stories, and in-law suites. Architect, permits, and inspections handled.
Composite and cedar decks, screened porches, and covered patios built to code with footings that last.
Older homes brought up to date, room by room or all at once, while you stay living in it.
Fourteen years of St. Louis brick bungalows and 1960s ranches taught us that every house has a surprise behind the drywall — so we price for it up front.
A real person answers. If we're on a job, you get a text in 60 seconds and a design visit on the calendar.
We measure, design with you, and give you one fixed price and a start date in writing. Changes are priced before they happen.
One crew lead, a text every evening with photos, and a final walkthrough. 5-year workmanship warranty.
"Kitchen was done in five weeks, exactly as scheduled. Daily texts with photos meant I never once wondered what was going on."
"Our last contractor disappeared halfway through a bathroom. Keystone finished it, fixed the plumbing the other guy botched, and came in under the quote."
"Added a master suite over the garage. Permits, engineering, inspections — they handled all of it. We just picked finishes."
Trucks dispatched from South County. Free design visits, usually within the week.
Fixed price, in writing, after a design visit. It only changes if you change the scope — and you'll see the price of any change before we do it.
Most kitchens are 4–6 weeks once materials are on site. Bathrooms 2–3 weeks. You get a calendar before we start.
Always. Permits, engineering when needed, and every inspection. You never talk to the city unless you want to.
Almost always. We seal off the work area, keep a path clear, and set up a temporary kitchen for kitchen remodels.
Fastest is the phone. If we miss you, the text comes right back.
(314) 555-0142